Rehabilitation of Old Deg Nullah from Deg Diversion Channel to Q.B Link Canal

Rehabilitation of Old Deg Nullah from Deg Diversion Channel to Q.B Link Canal

Project Code:  GB-02

Fund Implementing Partner: Punjab Irrigation Department

Project Profile

Grant Implementation Signing Date

19th September 2019

Project Start Date

19th September 2019

Project End Date

10th June 2023

Completion Time (Duration)

45 Months

  • Thematic Area:  Flood Resilience
  • Plan: NDMP, SFDRR, NFPP-IV
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievment

1.  Number of flood protection/river trainning works constructed/improved
  • 14 Nos. VR Bridges
  • 36 Nos. Inlets
  • 01 No. Outfall
2. KM of critical flood disaster risk reduction structures retrofitted and /or reconstructed
  • Channelization of 31.39 KM Nullah
  • Funding Ratio :

70%-NDRMF Share

30%-FIP Share

    Project Size: Medium (<500)

0 M
Total Project Cost
  • Status :
Completed
Project Objective
  • Improve resilience to flooding
  • Rehabilitate and raise existing flood defence and manage the risk of flooding
Project Outcome

Increased physical capacity to reduce the socioeconomic and fiscal impacts of natural hazards

Project Impact

A more disaster-resilient Pakistan with reduced socioeconomic and fiscal vulnerability to natural hazards and climate variability and change

Geographical Coverage

20 villages of Tehsil Sheikhupura.

Project Gallery

InterventionsProvinceDistrictProject Site
1. Channelization of 31.39 KM NullahPUNJABSheikhupuraSharaqpur
2. Construction of 14 Nos. VR BridgesPUNJABSheikhupuraSharaqpur
3. Construction of 01 No. OutfallPUNJABSheikhupuraSharaqpur
4. Construction of 36 Nos. InletsPUNJABSheikhupuraSharaqpur

Targeted Beneficiary

Total Beneficiary
Direct Beneficiaries
Indirect Beneficiaries
Project Description

The project for flood management of Deg Nallah was conceived to manage flood problems caused by its overspills. As the Nallah moves downstream, the longitudinal slope diminishes and cross sections become deeper gradually. The existing channel capacity is generally limited and it bifurcates and overspills at many locations. The spill spread over extensive areas causes destruction of crops, inundating villages and damaging infrastructures in the area. The losses because of inundation are high in monetary terms, human sufferings, properties, infrastructures, land damage and consequently damage to fertile land etc. Further, the villages along Deg Nallah come under threat, endangering life and property due to severe erosion. To cater these damages, the proposed project has build resilience:

  • Urban & Rural population of the adjoining areas benefitted directly from the project.
  • The project is saving around 20 villages from flood inundation annually.
  • Project improved flood drainage system & reduced disaster risk by saving population of more than 40,000 people, adjoining infrastructure & agriculture land.
  • Saving thousands of acres of agriculture land and abadies from flood damages, in case of breach.
Contact Person

Name Rizwan Shahzad

Designation: Deputy Manager (Projects and Operations)

Tel: +92(300) 4898771           Fax: +92-51-9108300                         Email: [email protected]

Address: 5th Floor, NDRMF EOBI House G-10/4 Islamabad

SDGs Contribution

CONTACT US

CONTACT US

Stay Connected

Would you like to receive notifications on latest updates? No Yes