RESILIENT AND ADAPTIVE – POPULATION IN DISASTER (RAPID-II)
Project Code: NDRMF-08-23
Project Profile
Grant Implementation Signing Date
12th July 2023
Project Start Date
12th July 2023
Project End Date
31st January 2024
Completion Time (Duration)
6 Months 19 days
- Thematic Area: Disaster Risk Reduction
- Plan: NDMP, SFDRR, DRM, Climate Change
- Entity: Public
Indicators
Achievment
Number of people vulnerable to the negative impacts of multiple natural hazards as of 2016 better protected and became resilient.
20,322 individuals.
Hectare of land protected (agriculture/ non-agriculture) against negative impacts of multiple natural disasters.
1,261 Hectares of land.
Number of flood protection walls /reconstructed or rehabilitated.
04 Nos.
No. of direct beneficiaries (disaggregated data: sex, age, disability, minority groups wherever feasible) benefiting from the flood protection schemes.
20,322 Direct beneficiaries.
- Funding Ratio :
100% -NDRMF Share
Project Size: Medium (100-500)
- Status :
Completed
Project Objective
Improved flood protection infrastructure to reduce flooding associated impacts and incident in district DI Khan.
Project Outcome
- The project contributed towards effective flood management and safeguarding the communities (20,322 individuals) in 04 flash flood prone settlements.
- Protected 1,261 Hectares of land from floods.
Project Impact
Built resilient communities by promoting climate adaptation and disaster preparedness in DI Khan
Geographical Coverage
Khyber Pakhtunkhwa (D.I. Khan).
district.
Project Gallery
| Interventions | Province | District | Project Site |
|---|---|---|---|
| 1. Formation and Mobilization of VDRMCs | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location |
| 2. Community Based Disaster Risk Reduction Trainings for VDRMCs | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location |
| 3. Training for Community Emergency Response Teams (CERTs) | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location |
| 4.DRM Plans for Villages and Union councils Developed | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location-Village-Level, Location-UC-level |
| 5. Distribute Emergency Response Tool Kits | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location |
| 6. Training Kits (First Aid, Fire etc.) | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location |
| 7. Installation of 4 Early warning system | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location |
| 8. Construction of 39 Flood Protection Structures | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location |
| 9. Retrofitting of 29 Public Infrastructure Buildings | KP, GB | Chitral, Mansehra, Hunza, Gilgit, Skardu, Ghanche | Location |
| INTERVENTIONS | PROVINCE | DISTRICT | PROJECT SITE |
|---|---|---|---|
| Reconstruction and Rehabilitation of flood protection structure | Khyber Pakhtunkhwa | D.I. Khan | Village Fateh DI Khan |
| Reconstruction and Rehabilitation of flood protection structure | Khyber Pakhtunkhwa | D.I. Khan | Village Kiri Bakhtyar |
| Reconstruction and Rehabilitation of flood protection structure | Khyber Pakhtunkhwa | D.I. Khan | Village Basti Bakhtyar |
| Reconstruction and Rehabilitation of flood protection structure | Khyber Pakhtunkhwa | D.I. Khan | Village Mohallah Bakhtyar |
Targeted Beneficiary
Project Description
The project was designed in the aftermath of monsoon/flash flood 2022. Taking into account findings from field observation; feedback from community, government line departments, and stakeholders; and experience of implementing earlier phase of NDRMF-funded project, RAPID II had prioritized 04 damaged mega flood protection schemes in district DI Khan for reconstruction & rehabilitation. Ultimate objective was to promote effective disaster risk reduction and improve the resilience of vulnerable population of Balochistan.