REHABILITATION/STRENGTHENING OF WATER CONSERVATION STRUCTURES, FLOOD PROTECTION SCHEMES IN DISTRICT KILLA ABDULLAH AND NASEERABAD
Fund Implementing Partner: Baluchistan Irrigation Department
Project Profile
Grant Implementation Signing Date
7th July 2023
Project Start Date
7th July 2023
Project End Date
30th October 2024
Completion Time (Duration)
15 Months 1
- Thematic Area: Disaster Risk Reduction
- Plan: NDMP, SFDRR, NFPP-IV
- Entity: Public
Loading..........
The Data is Not Available
Indicators
Achievement
Number of people vulnerable to the negative impacts of multiple natural hazards better protected and became resilient
Beneficiaries Direct = 321,654 individuals
Hectare of land protected (agriculture/non-agriculture) against negative impacts of multiple natural hazards
Agriculture Land = 7537 Ha
Non-agriculture Land = 16
Number of flood protection/water conservation structures and river training works constructed / improved (leeves, dikes, GLOF schemes etc.)
Rehabilitation/Strengthening of Pir Alizai & Majak Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Rehabilitation/Strengthening of Killa Abdullah Bazar Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Rehabilitation/Strengthening of Dobandai Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Rehabilitation/Restoration of Essargai DA Dam
Spillway Cutting.
Ret: wall Cutoff.
Rehabilitation/Strengthening of Gulistan Karez Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Rehabilitation/Strengthening of Segai area Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Rehabilitation/Strengthening Flood Embankment of Pat Feeder canal.
Restoration of canal Embankment (RD 206 to 385).
Rehabilitation/Strengthening:
Flood Embankment of outfall Drain & 4 Nos. VRBs.
Restoration of Drain Embankment.
Const: of 4 Nos. VRBs.
1# Foot Bridge.
KM of critical flood disaster risk reduction structures retrofitted and/or reconstructed
34.518 KM
- Funding Ratio :
100% NDRMF Share
Project Size: Large (>500)
- Status :
Completed
The main objective of the proposed project is to protect/safeguard/Strengthen Canal Embankments, houses and agriculture land, Karezez, Tube wells etc. located in the project area from the effect of rain / flood water. After implementation of the project approximately 387,000 Heads, 412 acres eroded land of Killa Abdullah and 18600 acres of Naseerabad will be reclaimed, 130000 acres of land protection from flood devastation will be achieved, 69 Nos Tube wells, 09 Nos Karezez, 975 Nos of houses and other infrastructure will be saved from flood. 2590 Farm families who only depend upon agriculture will be benefited after implementation of this project.
- The schemes protected 387000 households, 130 acres of land, 69 tubewells and 09 Karezes.
- Rehabilitation of water reservoir structure helped flood prevention and also storage of water for
- drinking and irrigation purposes.
- The water reservoir has contributed in drought mitigation by recharging the ground water.
A more disaster-resilient Killa Abdullah and Naseerabad District with reduced socioeconomic and fiscal vulnerability due to risk of flooding. Communities and infrastructure and protected from potential damage.
Baluchistan (District Killa Addullah, Naseerabad).
Geographical Coverage
Project Gallery
INTERVENTIONS
PROVINCE
DISTRICT
PROJECT SITE
Rehabilitation/Strengthening of Pir Alizai & Majak Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Baluchistan
Killa Abdullah
Pir Alizai , Majak
Rehabilitation/Strengthening of Killa Abdullah Bazar Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Baluchistan
Killa Abdullah
Killa Abdullah Bazar
Rehabilitation/Strengthening of Dobandai Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Baluchistan
Killa Abdullah
Dobandai
Rehabilitation/Restoration of Essargai Dam
Spillway Cutting.
Ret: wall Cutoff.
Baluchistan
Killa Abdullah
Essargai
Rehabilitation/Strengthening of Gulistan Karez Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Baluchistan
Killa Abdullah
Gulistan Karez
Rehabilitation/Strengthening of Segai area Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.
Baluchistan
Killa Abdullah
Segai
Rehabilitation/Strengthening Flood Embankment of Pat Feeder Canal.
Restoration of canal Embankment (RD 206 to 385).
Baluchistan
Naseerabad
Pat-Fedder
Rehabilitation/Strengthening:
Flood Embankment of outfall Drain & 4 Nos. VRBs.
Restoration of Drain Embankment.
Const: of 4 Nos. VRBs.
1# Foot Bridge.
Baluchistan
Naseerabad
Usta Muhammad
Targeted Beneficiary
The monsoon and flash floods 2022 breached the dams and damaged flood protection structures at massive scale that require funding assistance to reconstruct and rehabilitate such schemes. The project was envisaged to protect the lives, livelihoods and infrastructure. Following 8 schemes were reconstructed and rehabilitated under the Project:
Sr. No.
Scheme Name
01
Rehabilitation of Pir Alizai & Majak Flood Protection Bund.
02
Rehabilitation of Killa Abdullah Bazar Flood Protection Bund.
03
Rehabilitation of Dobandi Flood Protection Bund.
04
Rehabilitation/Restoration of Essargai Delay Action Dam.
05
Rehabilitation of Gulistan Karez Flood Protection Bund.
06
Rehabilitation of Segai Area Flood Protection Bund.
07
Rehabilitation of Flood Embankment of Pat Feeder Canal RD 238+000 to
395+000 District Naseerabad.
08
Rehabilitation of Flood Embankment of Outfall Drain RD 000+000 to 104+000