Promoting Integrated Mountain Safety in Northern Pakistan (PIMSNP)-II
Project Code: PB 004-2
Fund Implementing Partner: Joint Venture of Aga Khan Foundation and Aga Khan Planning and Building Services
Project Profile
Grant Implementation Signing Date
1st September, 2021
Project Start Date
1st September, 2021
Project End Date
30th September, 2024
Completion Time (Duration)
35 Months
- Thematic Area: Disaster Risk Resilience
- Plan: NDMP, SFDRR
- Entity: Private
Loading..........
The Data is Not Available
Indicators
Achievement
- 5 Nos. of flood protection structures
- 2 Nos. of Early warning systems installed
- 0.5 KM
- Funding Ratio :
70%-NDRMF Share 69561813
30%-FIP Share 29810379
Project Size: Small (<100)
- Status :
Under Progress
The objective of the project was to ensure that communities in vulnerable areas are at reduced exposure to risks posed by natural hazards and are better prepared to response and cope in disaster situations. This is achieved through the following:
- Infrastructure improvements reduced vulnerability to hazards through schools retrofitting and flood protection structures.
- Non-structural measures improved government and community preparedness to respond when disasters strike. This was achieved through implementation of a range of community-based disaster risk management activities in vulnerable settlements (including formation of Village Disaster Risk Management Plans, formation/strengthening of CERTs, creation and/or distribution of emergency toolkits and equipment, and awareness-raising activities).
- Installation of Early Warning Systems (EWSs).
Communities vulnerable to the negative impacts of multiple natural hazards better protected and became resilient.
Increased Institutional and Physical capacity to reduce the socioeconomic and fiscal impacts of natural hazards and climate change in Pakistan.
Geographical Coverage
Project Gallery
Interventions | Province | District | Project Site |
---|---|---|---|
1. Installation of 2 Early warning system | KP | Chitral, Mansehra | Bumbraith, Guldheri |
2. Construction of 5 Flood Protection Structures | KP | Chitral, Mansehra | Location |
Targeted Beneficiary
Based on the learning of PIMSNP I and to amplify impact of existing interventions the JV of AKF/AKPBS has designed additional interventions along preparedness and active structural interventions in district Chitral and Mansehra in KP province. The project interventions are focusing on two key components
- Component 1: construction of protective and climate resilient infrastructures
- Component 2: establishment of Multi hazard early warning systems
Name: Sadaf Tahir
Designation: Deputy Manager Projects Appraisal and Management
Tel: +92-51-9108300 Fax: +92-51-910837 Email: [email protected]
Address NDRMF, 5th Floor, EOBI House, Mauve Area, Sector G-10/4, Islamabad