Home > Projects

Rehabilitation/Restoration of Jalala Flood Protection Bund from RD 0+000 to 26+700

Rehabilitation/Restoration of Jalala Flood Protection Bund from RD 0+000 To 26+700

Project Code:  GB-04

Fund Implementing Partner: Punjab Irrigation Department

Project Profile

Grant Implementation Signing Date

19th September, 2019

Project Start Date

19th September, 2019

Project End Date

10th June , 2023

Completion Time (Duration)

44 Months

  • Thematic Area: Flood Resilience
  • Plan: NDMP, SFDRR, NFPP-IV
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievement

1.  Number of flood protection/river trainning works constructed/improved
  • Construction of Spurs 3 Nos.
  • Rehabilitation of embankment 1 No.
2. KM of critical flood disaster risk reduction structures retrofitted and /or reconstructed
  • Restoration of embankment 8.2 KM
  • Funding Ratio :

70%-NDRMF Share

30%-FIP Share

    Project Size: Medium (<500)

0
Total Project Cost
  • Status :
Completed
Project Objective
  • Improve resilience to flooding
  • Rehabilitate and raise existing flood defence and manage the risk of flooding
Project Outcome

Increased Physical capacity to reduce the socioeconomic and fiscal impacts of natural hazards.

Project Impact

A more disaster-resilient Pakistan with reduced socioeconomic and fiscal vulnerability to natural hazards and climate variability and change

Geographical Coverage

103 villages of Tehsil Shakargarh, District Narowal of Punjab Province

Geographical Coverage

Project Gallery

InterventionsProvinceDistrictProject Site
1. Construction of Spurs 3 Nos.PunjabNarowalAkhlaspur
2. Restoration of embankment 8.2 KMPunjabNarowalAkhlaspur

Targeted Beneficiary

Total Beneficiary
Direct Beneficiaries
Indirect Beneficiaries
Project Description

Nullah Ujh is one of the most prominent tributary of River Ravi in Tshil Shakargarh of District Narowal. Jalala flood embankment is forming defence to flood for 103 villages in vicinity of Jalal Sharif in Tehsil Shakargarh. There was a need to find a comprehensive solution to avoid breach of Jalala flood bund in future and to avoid haphazard flood fighting carried out each year. This reach was under sever threat and due to deferred maintenance the bund along with allied river training works were also in bad shape. This mitigation measure will improve and make this vital flood defence as resilient for the safety of the area against fluvial floods in Nullah Ujh.  Further, the project benefits are not limited to:

  • Achieving flood mitigation in the adjoin areas of Jalala Sharif Tehsil Shakargarh, District Narowal
  • Avoiding haphazard works during floods
  • Saving thousands of acres of agriculture land and abadies from flood damages, in case of breach
  • Less flood risks to masses/ vulnerable groups
  • Improvement of irrigation flood infrastructure
  • Habitat improvements to improve biodiversity
  • River restoration and naturalization
  • Improvements to public access and enjoyment of the River Ravi corridor and interpretation of this environment for the public benefit
Contact Person

Name Rizwan Shahzad

Designation: Deputy Manager (Projects and Operations)

Tel: +92(300) 4898771           Fax: +92-51-9108300                         Email: [email protected]

Address: 5th Floor, NDRMF EOBI House G-10/4 Islamabad

SDGs Contribution

CONTACT US

CONTACT US

Stay Connected

Would you like to receive notifications on latest updates? No Yes