Rehabilitation/Restoration of Jalala Flood Protection Bund from RD 0+000 To 26+700
Project Code: GB-04
Fund Implementing Partner: Punjab Irrigation Department
Project Profile
Grant Implementation Signing Date
19th September, 2019
Project Start Date
19th September, 2019
Project End Date
10th June , 2023
Completion Time (Duration)
44 Months
- Thematic Area: Flood Resilience
- Plan: NDMP, SFDRR, NFPP-IV
- Entity: Public
Loading..........
The Data is Not Available
Indicators
Achievement
- Construction of Spurs 3 Nos.
- Rehabilitation of embankment 1 No.
- Restoration of embankment 8.2 KM
- Funding Ratio :
70%-NDRMF Share
30%-FIP Share
Project Size: Medium (<500)
- Status :
Completed
- Improve resilience to flooding
- Rehabilitate and raise existing flood defence and manage the risk of flooding
Increased Physical capacity to reduce the socioeconomic and fiscal impacts of natural hazards.
A more disaster-resilient Pakistan with reduced socioeconomic and fiscal vulnerability to natural hazards and climate variability and change
103 villages of Tehsil Shakargarh, District Narowal of Punjab Province
Geographical Coverage
Project Gallery
Interventions | Province | District | Project Site |
---|---|---|---|
1. Construction of Spurs 3 Nos. | Punjab | Narowal | Akhlaspur |
2. Restoration of embankment 8.2 KM | Punjab | Narowal | Akhlaspur |
Targeted Beneficiary
Nullah Ujh is one of the most prominent tributary of River Ravi in Tshil Shakargarh of District Narowal. Jalala flood embankment is forming defence to flood for 103 villages in vicinity of Jalal Sharif in Tehsil Shakargarh. There was a need to find a comprehensive solution to avoid breach of Jalala flood bund in future and to avoid haphazard flood fighting carried out each year. This reach was under sever threat and due to deferred maintenance the bund along with allied river training works were also in bad shape. This mitigation measure will improve and make this vital flood defence as resilient for the safety of the area against fluvial floods in Nullah Ujh. Further, the project benefits are not limited to:
- Achieving flood mitigation in the adjoin areas of Jalala Sharif Tehsil Shakargarh, District Narowal
- Avoiding haphazard works during floods
- Saving thousands of acres of agriculture land and abadies from flood damages, in case of breach
- Less flood risks to masses/ vulnerable groups
- Improvement of irrigation flood infrastructure
- Habitat improvements to improve biodiversity
- River restoration and naturalization
- Improvements to public access and enjoyment of the River Ravi corridor and interpretation of this environment for the public benefit
Name Rizwan Shahzad
Designation: Deputy Manager (Projects and Operations)
Tel: +92(300) 4898771 Fax: +92-51-9108300 Email: [email protected]
Address: 5th Floor, NDRMF EOBI House G-10/4 Islamabad