Home > Projects

Promoting Integrated Mountain Safety in Northern Pakistan (PIMSNP)-II

Promoting Integrated Mountain Safety in Northern Pakistan (PIMSNP)-II

Project Code:  PB 004-2

Fund Implementing Partner: Joint Venture of Aga Khan Foundation and Aga Khan Planning and Building Services

Project Profile

Grant Implementation Signing Date

1st September, 2021

Project Start Date

1st September, 2021

Project End Date

30th September, 2024

Completion Time (Duration)

35 Months

  • Thematic Area:  Disaster Risk Resilience
  • Plan: NDMP, SFDRR 
  • Entity: Private

Loading..........

The Data is Not Available

Indicators

Achievement

1.  Number of Flood Protection Structures constructed
  • 5 Nos. of flood protection structures
2. Number of EWS installed in local levels
  • 2 Nos. of Early warning systems installed
3. KM of new river training works
  • 0.5 KM
  • Funding Ratio :

70%-NDRMF Share 69561813

30%-FIP Share 29810379

    Project Size: Small (<100)

0 M
Total Project Cost
  • Status :
Under Progress
Project Objective

The objective of the project was to ensure that communities in vulnerable areas are at reduced exposure to risks posed by natural hazards and are better prepared to response and cope in disaster situations. This is achieved through the following:

  • Infrastructure improvements reduced vulnerability to hazards through schools retrofitting and flood protection structures.
  • Non-structural measures improved government and community preparedness to respond when disasters strike. This was achieved through implementation of a range of community-based disaster risk management activities in vulnerable settlements (including formation of Village Disaster Risk Management Plans, formation/strengthening of CERTs, creation and/or distribution of emergency toolkits and equipment, and awareness-raising activities).
  • Installation of Early Warning Systems (EWSs).
Project Outcome

Communities vulnerable to the negative impacts of multiple natural hazards better protected and became resilient.

Project Impact

Increased Institutional and Physical capacity to reduce the socioeconomic and fiscal impacts of natural hazards and climate change in Pakistan.

Geographical Coverage

Project Gallery

InterventionsProvinceDistrictProject Site
1. Installation of 2 Early warning system KPChitral, MansehraBumbraith, Guldheri
2. Construction of 5 Flood Protection Structures KPChitral, MansehraLocation

Targeted Beneficiary

722
Total Beneficiary
147
Direct Beneficiaries
574
Indirect Beneficiaries
Project Description

Based on the learning of PIMSNP I and to amplify impact of existing interventions the JV of AKF/AKPBS has designed additional interventions along preparedness and active structural interventions in district Chitral and Mansehra in KP province. The project interventions are focusing on two key components

  • Component 1: construction of protective and climate resilient infrastructures
  • Component 2: establishment of Multi hazard early warning systems
Contact Person

Name: Sadaf Tahir

Designation: Deputy Manager Projects Appraisal and Management

Tel: +92-51-9108300           Fax: +92-51-910837        Email: [email protected]

Address NDRMF, 5th Floor, EOBI House, Mauve Area, Sector G-10/4, Islamabad

SDGs Contribution

CONTACT US

CONTACT US

Stay Connected

Would you like to receive notifications on latest updates? No Yes