Recoupment of Damaged T-Head Spur along Agani Akil Loop Bund 2/6+250, Stone Apron at Mole of 0/4 and 0/7 Mole Spurs and 09 Nos. Stone Studs in Larkana Sub Division
Project Code: GB-011
Fund Implementing Partner: Sindh Irrigation Department
Project Profile
Grant Implementation Signing Date
20th March 2020
Project Start Date
20th March 2020
Project End Date
30th November 2022
Completion Time (Duration)
32 Months
- Thematic Area: Flood Resilience
- Plan: NDMP, SFDRR, NFPP-IV
- Entity: Public
Loading..........
The Data is Not Available
Indicators
Achievement
- Total flood managment infrastructure 12 Nos.
- Recoupment of Spurs 3 Nos.
- Recoupment of T-head Spurs 1 No.
- Recoupment of mole Spurs 2 Nos.
- Construction of Studs 9 Nos.
- Rehabilitation of embankment 1.5 KM
- Funding Ratio :
70%-NDRMF Share
30%-FIP Share
Project Size: Medium (100-500)
- Status :
Completed
- Construction of 01 No. T-Head Spur
- Construction of 09 Nos. Studs
- Construction of 02 Nos. Mole Spurs
- Rehabilitation of Bund
- Improve resilience to flooding
- Protect vulnerable communities in District Larkana
Increase physical capacity to reduce the socioeconomic and fiscal impacts of natural hazards
A more disaster-resilient Pakistan with reduced socioeconomic and fiscal vulnerability to natural hazards and climate variability and change
Geographical Coverage
Project Gallery
Interventions | Province | District | Project Site |
---|---|---|---|
1. Recoupment of Spurs 3 Nos.. | Sindh | Larkana | Agani Akil |
2. Recoupment of T-head Spurs 1 No. | Sindh | Larkana | Agani Akil |
3. Recoupment of mole Spurs 2 Nos. | Sindh | Larkana | Agani Akil |
4. Construction of Studs 9 Nos. | Sindh | Larkana | Agani Akil |
Targeted Beneficiary
The project area is in District Larkana is highly vulnerable to floods. The proposed flood mitigation measure will serve all communities especially farmers, labourers and the poor who are most vulnerable to destruction brought upon by floods in case of failure of flood defences. The recoupment of damaged T-Head Spur and Stone Apron will reduce the vulnerability of District Larkana and create a sense of security among people. Human settlements/ lives will be protected and surrounding physical infrastructure will be sheltered from potential flooding.
Name: Amina Sadaf
Designation: Deputy Manager Projects Appraisal and Management
Tel: +92-51-9108300 Fax: +92-51-9108377 Email: [email protected]
Address: NDRMF, 5th Floor, EOBI House, Mauve Area, Sector G-10/4, Islamabad