Home > Projects

Recoupment of Damaged T-Head Spur along Agani Akil Loop Bund 2/6+250, Stone Apron at Mole of 0/4 and 0/7 Mole Spurs and 09 Nos. Stone Studs in Larkana Sub Division

Recoupment of Damaged T-Head Spur along Agani Akil Loop Bund 2/6+250, Stone Apron at Mole of 0/4 and 0/7 Mole Spurs and 09 Nos. Stone Studs in Larkana Sub Division

Project Code:  GB-011

Fund Implementing Partner: Sindh Irrigation Department

Project Profile

Grant Implementation Signing Date

20th March 2020

Project Start Date

20th March 2020

Project End Date

30th November 2022

Completion Time (Duration)

32 Months

  • Thematic Area: Flood Resilience
  • Plan: NDMP, SFDRR, NFPP-IV
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievement

1.  Number of flood protection/river trainning works constructed/improved
  • Total flood managment infrastructure 12 Nos.
  • Recoupment of Spurs 3 Nos.
  • Recoupment of T-head Spurs 1 No.
  • Recoupment of mole Spurs 2 Nos.
  • Construction of Studs 9 Nos.
2. KM of critical flood disaster risk reduction structures retrofitted and /or reconstructed
  • Rehabilitation of embankment 1.5 KM
  • Funding Ratio :

70%-NDRMF Share

30%-FIP Share

    Project Size: Medium (100-500)

0 M
Total Project Cost
  • Status :
Completed
Project Activities
  • Construction of 01 No. T-Head Spur
  • Construction of 09 Nos. Studs
  • Construction of 02 Nos. Mole Spurs
  • Rehabilitation of Bund
Project Objective
  • Improve resilience to flooding
  • Protect vulnerable communities in District Larkana
Project Outcome

Increase physical capacity to reduce the socioeconomic and fiscal impacts of natural hazards

Project Impact

A more disaster-resilient Pakistan with reduced socioeconomic and fiscal vulnerability to natural hazards and climate variability and change

Geographical Coverage

Project Gallery

InterventionsProvinceDistrictProject Site
1. Recoupment of Spurs 3 Nos..SindhLarkanaAgani Akil
2. Recoupment of T-head Spurs 1 No.SindhLarkanaAgani Akil
3. Recoupment of mole Spurs 2 Nos.SindhLarkanaAgani Akil
4. Construction of Studs 9 Nos.SindhLarkanaAgani Akil

Targeted Beneficiary

Total Beneficiary
Direct Beneficiaries
Indirect Beneficiaries
Project Description

The project area is in District Larkana is highly vulnerable to floods. The proposed flood mitigation measure will serve all communities especially farmers, labourers and the poor who are most vulnerable to destruction brought upon by floods in case of failure of flood defences. The recoupment of damaged T-Head Spur and Stone Apron will reduce the vulnerability of District Larkana and create a sense of security among people. Human settlements/ lives will be protected and surrounding physical infrastructure will be sheltered from potential flooding. 

Contact Person

Name: Amina Sadaf

Designation: Deputy Manager Projects Appraisal and Management

Tel: +92-51-9108300           Fax: +92-51-9108377                         Email: [email protected]

Address: NDRMF, 5th Floor, EOBI House, Mauve Area, Sector G-10/4, Islamabad

SDGs Contribution

CONTACT US

CONTACT US

Stay Connected

Would you like to receive notifications on latest updates? No Yes