Promoting Integrated Mountain Safety in Northern Pakistan (PIMSNP – III)

Promoting Integrated Mountain Safety in Northern Pakistan (PIMSNP – III)

Project Code:  NDRMF-09-23
Fund Implementing Partner: Aga Khan Foundation (AKF) & Aga Khan Agency for Habitat (AKAH)

Project Profile

Grant Implementation Signing Date

18th July, 2023

Project Start Date

18th July, 2023

Project End Date

31st January , 2024

Completion Time (Duration)

6 Months

  • Thematic Area: Disaster Risk Reduction
  • Plan: (NDMP) & NDRMF
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievement

1.  Construction of Flood Protection Schemes
  • 09
2.  Establish Early Warning Systems
  • 02
  • Funding Ratio :

100% NDRMF Share

0%FIP Share

    Project Size: Medium
0 M PKR
Total Project Cost
  • Status :
Under Implementation
Project Objective

Vulnerable Communities (men, women, children and vulnerable groups) with adaptation of DRR and climate change resilient practices are living with sense of safety and security.

Project Outcome

Increased institutional and physical capacity to reduce the socio-economic and fiscal impacts of natural hazards and climate change in Pakistan

Project Impact

Vulnerable Communities (men, women, children and vulnerable groups) with adaptation of DRR and climate change resilient practices are living with sense of safety and security.

Geographical Coverage

Geographical Coverage

District Mansehra, Lower Chitral and Upper Chitral

Project Gallery

InterventionsProvinceDistrictProject Site
1. Construction of Flood Mitigation Scheme Booni Gole 1KPUpper ChitralVillage Bozhir Booni, UC Charun
2. Construction of Flood Mitigation Scheme Booni Gole 2KPUpper ChitralVillage Shakarantek Booni, UC Charun
3. Construction of Flood Mitigation Scheme Reshun - 2KPUpper ChitralVillage Aliyan Reshun, UC Charun
4. Construction of Flood Mitigation Scheme Chinar Mastuj -1KPUpper ChitralVillage Chinar Mastuj, UC Mastuj
5. Construction of Flood Mitigation Scheme Chinar Mastuj -2KPUpper ChitralVillage Chinar Mastuj, UC Mastuj
6. Construction of Flood Mitigation Scheme Booni Gole-3KPUpper ChitralVillage Charantek Booni, UC Charun
7. Construction of Flood Mitigation Scheme Guldheri-2KPUpper ChitralVillage Guldheri, UC Gari habibullah
8. Construction of Flood Mitigation Scheme Seri MuhallahKPUpper ChitralVillage Seri Muhallah, UC Gari Habibullah
9. Construction of Flood Mitigation Scheme Mohallah BaghKPUpper ChitralVillage Mohallah Bagh, UC Shinkiyari
10. Early Warning System OughutiKPUpper ChitralVillage Birzeen
11. Early Warning System Awi ShoghorKPUpper ChitralVillage Awi Shoghor

Targeted Beneficiary

Cater nationwide needs for COVID 19 preparedness and response.
Project Description

Disaster vulnerability and climate change is a multidimensional issue and can be addressed through an integrated approach encompassing measures to improve the built environment in which the people reside, study, and work as well as to improve the capacities of communities related to disaster awareness, planning, and response. In PIMSNP-III AKF(Pak) and AKAH, P propose an integrated multi-input initiative to reduce the vulnerabilities of the communities residing in disaster-prone areas. The proposed initiative follows a holistic approach that comprises of two crucial components.

  • The first component is based on hard interventions pertaining to infrastructural improvements to enhance climate resilience and reduce exposure to disasters’ risks through:
  • Construction of 9-10 flood protection structures at the vulnerable sites.
  • The second component caters to the installation of early warning systems.
  • 02 sites have been identified in Chitral and Mansehra, where installation of EWS will enable monitoring of hazards and timely transmission of data to at-risk communities and key stakeholders to anticipate disasters and strengthen response windows and capacities.

In these measures, special needs and requirements of girls and women along with differently abled people will be considered and accordingly incorporated in the planning, design, and implementation phases.

Contact Person

Name: Malik Najaf Khan

Designation: Manager Projects Appraisal and Management

Tel: +92-51-9108300           Fax: +92-51-9108377                         Email: Najaf.Khan@ndrmf.pk

Address: NDRMF, 5th Floor, EOBI House, Mauve Area, Sector G-10/4, Islamabad

SDGs Contribution

CONTACT US

CONTACT US

Stay Connected

Would you like to receive notifications on latest updates? No Yes