Home > Projects

Rehabilitation/Restoration of Hajipur Gujran Flood Protection Bund RD 0+000 to 37+750

Rehabilitation/Restoration of Hajipur Gujran Flood Protection Bund RD 0+000 TO 37+750

Project Code:  GB-03

Fund Implementing Partner: Punjab Irrigation Department

Project Profile

Grant Implementation Signing Date

19th September 2019

Project Start Date

19th September 2019

Project End Date

10th June 2023

Completion Time (Duration)

44 Months

  • Thematic Area:  Flood Resilience
  • Plan: NDMP, SFDRR, NFPP-IV
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievement

1.  Number of flood protection/river trainning works constructed/improved
  • Construction/Rehabilitation of 8 Nos. of Spurs
  • Rehabilitation of flood embankment 1 No.
2. KM of critical flood disaster risk reduction structures retrofitted and /or reconstructed
  • 12 KM of embankment
  • Funding Ratio :

70%-NDRMF Share

30%-FIP Share

    Project Size: Large (>500)

0 M
Total Project Cost
  • Status :
Completed
Project Objective
  • Improve resilience to flooding
  • Rehabilitate and raise existing flood defense and manage the risk of flooding
Project Outcome

Protection of main embankment, allied infrastructures and adjoining abadies near Kot Naina Tehsil Shakargarh, District Narowal

Project Impact

A more disaster-resilient Pakistan with reduced socioeconomic and fiscal vulnerability to natural hazards and climate variability and change

Geographical Coverage

103 villages of Tehsil Shakargarh, District Narowal

Geographical Coverage

Project Gallery

InterventionsProvinceDistrictProject SiteImages
1. Raising and Strengthening of Embankment from RD 0 to RD 37+750PunjabNarowalKot Naina
2. Construction of 08 number SpursPunjabNarowalKot Naina
3. Stone Apron, Stone Pitching of vulnerable reachesPunjabNarowalKot Naina
4. Construction of shingle service track over bundPunjabNarowalKot Naina

Targeted Beneficiary

Total Beneficiary
Direct Beneficiaries
Indirect beneficiaries
Project Description

The project is designed to protect Tehsil Shakargarh District Narowal which is at Risk level “A” among most vulnerable flood districts of Punjab. This flood mitigation measure will strengthen defense against flood at Hajipur and will serve all communities specially farmers, laborers and poor living who are the most vulnerable to floods in case of failure of flood defenses/ breach of Hajipur Gujran flood bund. The Rehabilitation of Hajipur Gurjan Flood Protection bund will make villages of Tehsil Shakargarh safe from the flood of River Ravi. Accordingly, this project aims to provide relief to approximately 0.3 million people living in flood prone villages along the bund from flood disaster of River Ravi.

Contact Person

Name Rizwan Shahzad

Designation: Deputy Manager (Projects and Operations)

Tel: +92(300) 4898771           Fax: +92-51-9108300                         Email: [email protected]

Address: 5th Floor, NDRMF EOBI House G-10/4 Islamabad

SDGs Contribution

CONTACT US

CONTACT US

Stay Connected

Would you like to receive notifications on latest updates? No Yes