Restoration/Rehabilitation of Flood Protection Structures and Water Conservation Structures in District Pishin

RESTORATION/REHABILITATION OF FLOOD PROTECTION STRUCTURES AND WATER CONSERVATION STRUCTURES IN DISTRICT PISHIN

Project Code:  NDRMF-04-23

Fund Implementing Partner: Baluchistan Irrigation Department

Project Profile

Grant Implementation Signing Date

25th May 2023

Project Start Date

25th May 2023

Project End Date

30th October 2024

Completion Time (Duration)

17 Months

  • Thematic Area: Flood Resilience
  • Plan: NDMP, SFDRR, NFPP-IV
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievement

No. of people vulnerable to the negative impacts of multiple natural hazards better protected and became resilient

372,000 individuals

Hectare of land protected (agriculture/non-agriculture) against negative impacts of multiple natural disasters

Agriculture Land = 1500

Number of flood protection/water conservation structures and river training works constructed / improved (levees, dikes, GLOF schemes etc.)

Bund Khushdil Khan:
Restoration of Breached Portion of Khushdil Khan Bund.
Restoration of Breached Portion of Malikyar Bund along with Barshore River.
Spillway widening and Restoration of Gates.
Restoration of Breached Portion of Malikyar Protection Wall along Orchards.

Thore Murgha Dam:
Restoration of Weir, inlet, outlet and Dam Embankment.
Stone Masonry wall for out let structure.

Earthen Bund Khanai Baba:
Rehabilitation of Weir.
Rehabilitation of Guide Bund.
Rehabilitation of Protection Wall.
Rehabilitation of Flood Channel.

Khanozai Bałozai Headwork:
Rehabilitation of Weir.

Khanozai Delay Action Dam:
Raising of Dam Body.
Raising of Sidle Bund
Spillway Re-Modeling
Stone Masonry Protection Wall (3800 Rft).
Flood Channel.
Box Culvert 2 Nos.

Kezh Dam at Toba Kakarai:
Raising of Dam Body.
SpillWay Re-Modeling.
Flood Protection Wall.

Khasro Dam Toba Kakarai:
Restoration & Strengthening of Dam Body.
Restoration of Spillway.

Bund of Sarila Habibzai, Manzakakai and Bagarzai:
Restoration of flood Project Sarila Habibzai, Manzakai and Bagharzai.

F.P Wall Poti Mangaizai Mama Nikah & Mehrab Kech:
Restoration of F.P Wall for Orchards and Houses Poti Mangalzai.
Restoration of F.P Wall for Orchards and Houses Mama Nikah.
Restoration of F.P Wall for Orchards and Houses Mehrab Kech.

Khoudadzai Flood Protection Scheme:
Restoration of Bundh
Restoration & Strengthening weir R/s Portion.

Kar Dam Toba Kakarai:
Raising of Dam Body.
Spillway ReModeling.
Flood Protection Wall.

Surchah Delay Action Dam:
Restoration & Strengthening of Dam Body.

Chengai Begharzai Check Dam:
Restoration & Strengthening of Dam Body.
Restoration of Spillway.
F.P Wall for Orchards and Houses.

Wachobi Dam:
Restoration & Strengthening of Dam Body.
Restoration of Spillway.

Surkai Ghez Dam:
Restoration of Dam (Breached Portion).
Widening of Spillway.
Restoration of Flood Protections for Orchards and Houses.

Pani Shakh Dam:
Raising of Dam Body.
Spillway ReModeling.


Khchani Tamark Check Dam:
Restoration of Spillway of kochanai Tamarak Dam.
Restoration of flood protection wall for Orchards and houses.

Mandan Dam:
Spillway Re-Modeling.

Ghargai D.A Dam:
Restoration & Strengthening of Dam Body.
Restoration of Spillway.
F.P Wall for Orchards and Houses.

Bostan Dara Dam:
Re-Modeling of Spillway.
Flood Protection Wall.

Dargai Delay Action Dam:
Raising of Dam Body.

Shadaka Dam Toba Kakarai:
Restoration & Strengthening of Shasa Muhammadzai Dam Body.
Restoration & Strengthening of Shadaka Dam Body.
F.P Wall for Orchards and Houses. Restoration & Strengthening of Shasa Muhammadzai Dam Body.

Narin Jalak Dam:
Spillway Re-Modeling
Flood Protection Wall.

KM of critical flood disaster risk reduction structures retrofitted and/or reconstructed

19 km

  • Funding Ratio :

100% NDRMF Share

    Project Size: Large (>500)

0 M
Total Project Cost
  • Status :
Completed
Project Objective

The main objective of the proposed project is to protect safeguard the houses located in the project area from the effect of rain / flood water. After implementation of this project a commutative 800 houses will be saved from flood attack and 1177 Farm families will be benefited by this project. Orchards of apples are the main fruit which are grow in this area while wheat is the main crop which will be protected.

Project Outcome
  • Drought mitigation through restoration and strengthening and enhancement of life of Dams.
  • The interventions have been contributing in Significant Ground water recharge. Slope stabilization was ensured by the project interventions.
  • Protection of lives and livelihoods & physical infrastructure.
Project Impact

A more disaster-resilient Pishin with reduced socioeconomic and fiscal vulnerability to natural hazards and climate vulnerability and change.

Geographical Coverage

Baluchistan (District Pishin).

Geographical Coverage

Project Gallery

INTERVENTIONS

PROVINCE

DISTRICT

PROJECT SITE

Bund Khushdil Khan:
Restoration of Breached Portion of Khushdil Khan Bund.
Restoration of Breached Portion of Malikyar Bund along with Barshore River.
Spillway widening and Restoration of Gates.
Restoration of Breached Portion of Malikyar Protection Wall along Orchards.

Baluchistan

Pishin

Khushdil Khan

Thore Murgha Dam:
Restoration of Weir, inlet, outlet and Dam Embankment.
Stone Masonry wall for out let structure.

Baluchistan

Pishin

Thore Murgha

Earthen Bund Khanai Baba:
Rehabilitation of Weir.
Rehabilitation of Guide Bund.
Rehabilitation of Protection Wall.
Rehabilitation of Flood Channel.

Baluchistan

Pishin

Khanai Baba

Khanozai Bałozai Headwork:
Rehabilitation of Weir.

Baluchistan

Pishin

Khanozai Bałozai

Khanozai Delay Action Dam:
Raising of Dam Body.
Raising of Sidle Bund
Spillway Re-Modeling
Stone Masonry Protection Wall (3800 Rft).
Flood Channel.
Box Culvert 2 Nos.

Baluchistan

Pishin

Khanozai

Kezh Dam at Toba Kakarai:
Raising of Dam Body.
SpillWay Re-Modeling.
Flood Protection Wall.

Baluchistan

Pishin

Toba Kakarai

Khasro Dam Toba Kakarai:
Restoration & Strengthening of Dam Body.
Restoration of Spillway.

Baluchistan

Pishin

Toba Kakarai

Bund of Sarila Habibzai, Manzakakai and Bagarzai:
Restoration of flood Project Sarila Habibzai, Manzakai and Bagharzai.

Baluchistan

Pishin

Sarila Habibzai, Manzakakai and Bagarzai

F.P Wall Poti Mangaizai Mama Nikah & Mehrab Kech:
Restoration of F.P Wall for Orchards and Houses Poti Mangalzai.
Restoration of F.P Wall for Orchards and Houses Mama Nikah.
Restoration of F.P Wall for Orchards and Houses Mehrab Kech.

Baluchistan

Pishin

Poti Mangaizai, Mama Nikah & Mehrab Kech

Khoudadzai Flood Protection Scheme:
Restoration of Bundh
Restoration & Strengthening weir R/s Portion.

Baluchistan

Pishin

Khoudadzai

Kar Dam Toba Kakarai:
Raising of Dam Body.
Spillway ReModeling.
Flood Protection Wall.

Baluchistan

Pishin

Toba Kakarai

Surchah Delay Action Dam:
Restoration & Strengthening of Dam Body. .

Baluchistan

Pishin

Surchah

Chengai Begharzai Check Dam:
Restoration & Strengthening of Dam Body.
Restoration of Spillway.
F.P Wall for Orchards and Houses.

Baluchistan

Pishin

Chengai Begharzai

Wachobi Dam:
Restoration & Strengthening of Dam Body.
Restoration of Spillway.

Baluchistan

Pishin

Wachobi

Surkai Ghez Dam:
Restoration of Dam (Breached Portion).
Widening of Spillway.
Restoration of Flood Protections for Orchards and Houses.

Baluchistan

Pishin

Surkai

Pani Shakh Dam:
Raising of Dam Body.
Spillway ReModeling.

Baluchistan

Pishin

Pani Shakh

Alizai Dam:
Spillway ReModeling.

Baluchistan

Pishin

Alizai

Khchani Tamark Check Dam:
Restoration of Spillway of kochanai Tamarak Dam.
Restoration of flood protection wall for Orchards and houses.

Baluchistan

Pishin

Khchani Tamark

Mandan Dam:
Spillway Re-Modeling.

Baluchistan

Pishin

Mandan

Ghargai D.A Dam:
Restoration & Strengthening of Dam Body.
Restoration of Spillway.
F.P Wall for Orchards and Houses.

Baluchistan

Pishin

Ghargai

Bostan Dara Dam:
Re-Modeling of Spillway.
Flood Protection Wall.

Baluchistan

Pishin

Bostan

Dargai Delay Action Dam:
Raising of Dam Body.

Baluchistan

Pishin

Dargai

Shadaka Dam Toba Kakarai:
Restoration & Strengthening of Shasa Muhammadzai Dam Body.
Restoration & Strengthening of Shadaka Dam Body.
F.P Wall for Orchards and Houses. Restoration & Strengthening of Shasa Muhammadzai Dam Body.

Baluchistan

Pishin

Toba Kakarai

Narin Jalak Dam:
Spillway Re-Modeling
Flood Protection Wall.

Baluchistan

Pishin

Narin Jalak

Targeted Beneficiary

Total Beneficiary
Direct Beneficiary
Indirect Beneficiary
Project Description

The project area has been prone to the floods during heavy rains. The flash floods from hill torrents result in devastation engulfing almost entire areas because of high velocity and magnitude. The rainfall in July and August 2022 broke all the previous records and the high magnitude flash floods proved to be a catastrophe causing irreparable loss to precious human lives and public and private infrastructure. The sites were severely damaged during the flash floods and required immediate restoration. For the purpose following 23 schemes were implemented under the project:

Sr. No.

Scheme Name

01

Restoration of breached/ damaged portion of Bund Khoshdil Khan.

02

Rehabilitation of Thora Murgha dam and Weir.

03

Rehabilitation of Weir and Earthern Bund Khanai Baba Tehsil Karezaat.

04

Rehabilitation of Khanzoai Balozai Headwork Tehsil Karezat.

05

Rehabilitation of Khanozai Delay Action Dam Tehsil Karezat.

06

Rehabilitation of Kezh Dam at Toba Karkarai Area.

07

Restoration of Khasro Dam Toba Kakari.

08

Rehabilitation of Flood Protection Bund of Sarila Habibzai, Manzakai.

09

Restoration of F.P Wall Poti Mangalzai Mama Nikah and Mehrab Kech.

10

Rehabilitation of Khoudadzai Flood Protection Scheme.

11

Rehabilitation of Kar Dam Toba Kakarai Area.

12

Restoration of Surchah Delay Action Dam.

13

Restoration of Chengai Begharzai Check Dam.

14

Rehabilitation of Wachobi Dam Toba Kakari Area.

15

Restoration of Surkai Ghez Dam Toba Kakari.

16

Rehabilitation of Pani Shakh Dam Tehsil Nana Sahib.

17

Restoration of Khchani Tamark Check Dam.

18

Rehabilitation of Mandan Dam.

19

Rehabilitation Ghargai D.A Dam.

20

Rehabilitation of Bostan Dara Dam.

21

Rehabilitation of Dargai Delay Action Dam.

22

Shadaka Dam Toba Kakari and Shasa Muhammadzai Dam Barshore.

23

Rehabilitation of Narin Jalak Dam.