The Air We Breathe - A focused conference on air pollutionorganised by Dawn Media Group supported by NDRMF for update

Click Here
Home > Projects

Restoration & Rehabilitation of Flood Damaged Water Conservation Structures in Irrigation Division Quetta

Restoration & Rehabilitation of Flood Damaged Water Conservation Structures in Irrigation Division Quetta

Project Code:  NDRMF-03-23

Fund Implementing Partner: Baluchistan Irrigation Department

Project Profile

Grant Implementation Signing Date

25th May 2023

Project Start Date

25th May 2023

Project End Date

30th October 2024

Completion Time (Duration)

17 Months

  • Thematic Area: Flood Resilience
  • Plan: NDMP, SFDRR, NFPP-IV
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievement

No. of people vulnerable to the negative impacts of multiple natural hazards better protected and became resilient

Beneficiaries Direct = 460000 Individuals

Hectare of land protected (agriculture / non-agriculture) against negative impacts of multiple natural disasters

Agriculture Land = 950
Non-agriculture Land = 1200

Number of flood protection/water conservation structures and river training works constructed / improved (levees, dikes,
GLOF schemes etc.)

Spin Karez:
Rehabilitation of Dam Body.
Rehabilitation Spillway
Rehabilitation Guide Channel.
Mandoki Check Dam:
Restoration of Dam Body
Restoration of Pipe Outlet.

Small Dam Aghberg:
Only Spillway Rehabilitation.

Ghundak Karez Dam:
Only Spillway Rehabilitation.

Khalaka Check Dam Kuchlak.
Only Spillway Rehabilitation.

Murghi Kotal Dam:
Dam body
Spillway

Restoration of Shagai-I:
Dam body
Pipe outlet 6’
Spillway
M.S Pipe outlet 12’
U/S Gabian Check Dam.

Restoration of Habib Dara II:
Dam Body
Spillway Retaining Wall & Wing Walls
Pipe outlet
Core Wall

Restoration of Brewery Dam:
Dam Body
Spillway
Pipe outlet
Key wall and Catch Drain

Restoration of KACH Dam:
Dam body
Core wall

KM of critical flood disaster risk reduction structures retrofitted and/or reconstructed

Total length = 3.774 KM

  • Funding Ratio :

100% NDRMF Share

    Project Size: Large (>500)

0 M
Total Project Cost
  • Status :
Completed
Project Objective

Main objective of the project is to protect the lives and livelihoods of the local population along with critical infrastructure. After successful execution of the project, the following prime objectives will be achieved:

  • Restoration & Strengthening of Dams.
  • Slope Stabilization.
  • Enhancement of Life of Dams.
  • Significant Ground Water Recharge.
  • Protection of Population from flood havoc.
  • Protection of Physical Infrastructure.
  • Protection of Precious Human Lives.
Project Outcome
  • Drought mitigation through restoration and strengthening and enhancement of life of Dams.
  • The interventions have been contributing in Significant Ground water recharge.
  • Slope stabilization was ensured by the project interventions.
  • Protection of lives and livelihoods of the local population.
  • Protection of physical infrastructure.
Project Impact

A more disaster-resilient Baluchistan with reduced socioeconomic and fiscal vulnerability to natural hazards and climate variability and change.

Geographical Coverage

Baluchistan (District Quetta).

Geographical Coverage

Project Gallery

INTERVENTIONS

PROVINCE

DISTRICT

PROJECT SITE

Spin Karez:
Rehabilitation of Dam Body.
Rehabilitation Spillway
Rehabilitation Guide Channel.

Baluchistan

Quetta

Spin Karez

Mandoki Check Dam:
Restoration of Dam Body
Restoration of Pipe Outlet.

Baluchistan

Quetta

Mandoki

Small Dam Aghberg:
Only Spillway Rehabilitation.

Baluchistan

Quetta

Aghberg

Ghundak Karez Dam:
Only Spillway Rehabilitation.

Baluchistan

Quetta

Ghundak Karez

Khalaka Check Dam Kuchlak:
Only Spillway Rehabilitation.

Baluchistan

Quetta

Kuchlak

Murghi Kotal Dam:
Dam body
Spillway

Baluchistan

Quetta

Murghi Kotal

Restoration of Shagai-I:
Dam body
Pipe outlet 6’
Spillway
M.S Pipe outlet 12’
U/S Gabian Check Dam.

Baluchistan

Quetta

Shagai 

Restoration of Habib Dara II:
Dam Body
Spillway Retaining Wall & Wing Walls
Pipe outlet
Core Wall

Baluchistan

Quetta

Habib Dara

Restoration of Brewery Dam:
Dam Body
Spillway
Pipe outlet
Key wall and Catch Drain

Baluchistan

Quetta

Brewery

Restoration of KACH Dam:
Dam body
Core wall

Baluchistan

Quetta

KACH

Targeted Beneficiary

Total Beneficiary
Direct Beneficiary
Indirect Beneficiary
Project Description

The project area has been prone to the floods during heavy rains. The flash floods from hill torrents result in devastation engulfing almost entire areas because of high velocity and magnitude. The rainfall in July and August 2022 broke all the previous records and the high magnitude flash floods proved to be a catastrophe causing irreparable loss to precious human lives and public and private infrastructure. The sites were severely damaged during the flash floods and required immediate restoration. Main objective of the project was to protect the lives and livelihoods of the local population along with critical infrastructure. Following schemes were completed under the project:

Sr. No.

Sub-Scheme Name

01

Spin Karez Dam Quetta.

02

Mandoki Check Dam Quetta.

03

Small Dam Aghberg.

04

Ghundak Karez Check Dam.

05

Khalaka Check Dam Jalogeer Kuchlak.

06

Murghi Kotal Dam Kuchlak.

07

Shagai-I DAM.

08

Shagai-II DAM.

09

Habib Dara-II.

10

Brewery Delay Action Dam (Kar Khasa).

11

Kach Delay Action Dam.

CONTACT US

CONTACT US

Stay Connected

Would you like to receive notifications on latest updates? No Yes