Rehabilitation/Strengthening of Water Conservation Structures, Flood Protection Schemes in District Killa Abdullah and Naseerabad

REHABILITATION/STRENGTHENING OF WATER CONSERVATION STRUCTURES, FLOOD PROTECTION SCHEMES IN DISTRICT KILLA ABDULLAH AND NASEERABAD

Project Code:  NDRMF-06-23

Fund Implementing Partner: Baluchistan Irrigation Department

Project Profile

Grant Implementation Signing Date

7th July 2023

Project Start Date

7th July 2023

Project End Date

30th October 2024

Completion Time (Duration)

15 Months 1

  • Thematic Area: Disaster Risk Reduction
  • Plan: NDMP, SFDRR, NFPP-IV
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievement

Number of people vulnerable to the negative impacts of multiple natural hazards better protected and became resilient

Beneficiaries Direct = 321,654 individuals

Hectare of land protected (agriculture/non-agriculture) against negative impacts of multiple natural hazards

Agriculture Land = 7537 Ha
Non-agriculture Land = 16

Number of flood protection/water conservation structures and river training works constructed / improved (leeves, dikes, GLOF schemes etc.)

Rehabilitation/Strengthening of Pir Alizai & Majak Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Rehabilitation/Strengthening of Killa Abdullah Bazar Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Rehabilitation/Strengthening of Dobandai Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Rehabilitation/Restoration of Essargai DA Dam
Spillway Cutting.
Ret: wall Cutoff.

Rehabilitation/Strengthening of Gulistan Karez Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Rehabilitation/Strengthening of Segai area Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Rehabilitation/Strengthening Flood Embankment of Pat Feeder canal.
Restoration of canal Embankment (RD 206 to 385).

Rehabilitation/Strengthening:
Flood Embankment of outfall Drain & 4 Nos. VRBs.
Restoration of Drain Embankment.
Const: of 4 Nos. VRBs.
1# Foot Bridge.

KM of critical flood disaster risk reduction structures retrofitted and/or reconstructed

34.518 KM

  • Funding Ratio :

100% NDRMF Share

    Project Size: Large (>500)

0 M
Total Project Cost
  • Status :
Completed
Project Objective

The main objective of the proposed project is to protect/safeguard/Strengthen Canal Embankments, houses and agriculture land, Karezez, Tube wells etc. located in the project area from the effect of rain / flood water. After implementation of the project approximately 387,000 Heads, 412 acres eroded land of Killa Abdullah and 18600 acres of Naseerabad will be reclaimed, 130000 acres of land protection from flood devastation will be achieved, 69 Nos Tube wells, 09 Nos Karezez, 975 Nos of houses and other infrastructure will be saved from flood. 2590 Farm families who only depend upon agriculture will be benefited after implementation of this project.

Project Outcome
  • The schemes protected 387000 households, 130 acres of land, 69 tubewells and 09 Karezes.
  • Rehabilitation of water reservoir structure helped flood prevention and also storage of water for
  • drinking and irrigation purposes.
  • The water reservoir has contributed in drought mitigation by recharging the ground water.
Project Impact

A more disaster-resilient Killa Abdullah and Naseerabad District with reduced socioeconomic and fiscal vulnerability due to risk of flooding. Communities and infrastructure and protected from potential damage.

Geographical Coverage

Baluchistan (District Killa Addullah, Naseerabad).

Geographical Coverage

Project Gallery

INTERVENTIONS

PROVINCE

DISTRICT

PROJECT SITE

Rehabilitation/Strengthening of Pir Alizai & Majak Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Baluchistan

Killa Abdullah

Pir Alizai , Majak

Rehabilitation/Strengthening of Killa Abdullah Bazar Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Baluchistan

Killa Abdullah

Killa Abdullah Bazar

Rehabilitation/Strengthening of Dobandai Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Baluchistan

Killa Abdullah

Dobandai

Rehabilitation/Restoration of Essargai Dam
Spillway Cutting.
Ret: wall Cutoff.

Baluchistan

Killa Abdullah

Essargai

Rehabilitation/Strengthening of Gulistan Karez Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Baluchistan

Killa Abdullah

Gulistan Karez

Rehabilitation/Strengthening of Segai area Flood Protection Bund
Earthwork/Excavation.
Weaving G.I wire
Pitching/Filling in wire crates.

Baluchistan

Killa Abdullah

Segai

Rehabilitation/Strengthening Flood Embankment of Pat Feeder Canal.
Restoration of canal Embankment (RD 206 to 385).

Baluchistan

Naseerabad

Pat-Fedder

Rehabilitation/Strengthening:
Flood Embankment of outfall Drain & 4 Nos. VRBs.
Restoration of Drain Embankment.
Const: of 4 Nos. VRBs.
1# Foot Bridge.

Baluchistan

Naseerabad

Usta Muhammad

Targeted Beneficiary

Total Beneficiary
Direct Beneficiary
Indirect Beneficiary
Project Description

The monsoon and flash floods 2022 breached the dams and damaged flood protection structures at massive scale that require funding assistance to reconstruct and rehabilitate such schemes. The project was envisaged to protect the lives, livelihoods and infrastructure. Following 8 schemes were reconstructed and rehabilitated under the Project:

Sr. No.

Scheme Name

01

Rehabilitation of Pir Alizai & Majak Flood Protection Bund.

02

Rehabilitation of Killa Abdullah Bazar Flood Protection Bund.

03

Rehabilitation of Dobandi Flood Protection Bund.

04

Rehabilitation/Restoration of Essargai Delay Action Dam.

05

Rehabilitation of Gulistan Karez Flood Protection Bund.

06

Rehabilitation of Segai Area Flood Protection Bund.

07

Rehabilitation of Flood Embankment of Pat Feeder Canal RD 238+000 to
395+000 District Naseerabad.

08

Rehabilitation of Flood Embankment of Outfall Drain RD 000+000 to 104+000