Promoting Integrated Mountain Safety in Northern Pakistan (PIMSNP – III)
Project Profile
Grant Implementation Signing Date
18th July, 2023
Project Start Date
18th July, 2023
Project End Date
31st January , 2024
Completion Time (Duration)
6 Months
- Thematic Area: Disaster Risk Reduction
- Plan: (NDMP) & NDRMF
- Entity: Public
Loading..........
The Data is Not Available
Indicators
Achievement
- 09
- 02
- Funding Ratio :
100% NDRMF Share
0%FIP Share
- Status :
Under Implementation
Vulnerable Communities (men, women, children and vulnerable groups) with adaptation of DRR and climate change resilient practices are living with sense of safety and security.
Increased institutional and physical capacity to reduce the socio-economic and fiscal impacts of natural hazards and climate change in Pakistan
Vulnerable Communities (men, women, children and vulnerable groups) with adaptation of DRR and climate change resilient practices are living with sense of safety and security.
Geographical Coverage
Geographical Coverage
District Mansehra, Lower Chitral and Upper Chitral
Project Gallery
Interventions | Province | District | Project Site |
---|---|---|---|
1. Construction of Flood Mitigation Scheme Booni Gole 1 | KP | Upper Chitral | Village Bozhir Booni, UC Charun |
2. Construction of Flood Mitigation Scheme Booni Gole 2 | KP | Upper Chitral | Village Shakarantek Booni, UC Charun |
3. Construction of Flood Mitigation Scheme Reshun - 2 | KP | Upper Chitral | Village Aliyan Reshun, UC Charun |
4. Construction of Flood Mitigation Scheme Chinar Mastuj -1 | KP | Upper Chitral | Village Chinar Mastuj, UC Mastuj |
5. Construction of Flood Mitigation Scheme Chinar Mastuj -2 | KP | Upper Chitral | Village Chinar Mastuj, UC Mastuj |
6. Construction of Flood Mitigation Scheme Booni Gole-3 | KP | Upper Chitral | Village Charantek Booni, UC Charun |
7. Construction of Flood Mitigation Scheme Guldheri-2 | KP | Upper Chitral | Village Guldheri, UC Gari habibullah |
8. Construction of Flood Mitigation Scheme Seri Muhallah | KP | Upper Chitral | Village Seri Muhallah, UC Gari Habibullah |
9. Construction of Flood Mitigation Scheme Mohallah Bagh | KP | Upper Chitral | Village Mohallah Bagh, UC Shinkiyari |
10. Early Warning System Oughuti | KP | Upper Chitral | Village Birzeen |
11. Early Warning System Awi Shoghor | KP | Upper Chitral | Village Awi Shoghor |
Targeted Beneficiary
Disaster vulnerability and climate change is a multidimensional issue and can be addressed through an integrated approach encompassing measures to improve the built environment in which the people reside, study, and work as well as to improve the capacities of communities related to disaster awareness, planning, and response. In PIMSNP-III AKF(Pak) and AKAH, P propose an integrated multi-input initiative to reduce the vulnerabilities of the communities residing in disaster-prone areas. The proposed initiative follows a holistic approach that comprises of two crucial components.
- The first component is based on hard interventions pertaining to infrastructural improvements to enhance climate resilience and reduce exposure to disasters’ risks through:
- Construction of 9-10 flood protection structures at the vulnerable sites.
- The second component caters to the installation of early warning systems.
- 02 sites have been identified in Chitral and Mansehra, where installation of EWS will enable monitoring of hazards and timely transmission of data to at-risk communities and key stakeholders to anticipate disasters and strengthen response windows and capacities.
In these measures, special needs and requirements of girls and women along with differently abled people will be considered and accordingly incorporated in the planning, design, and implementation phases.
Name: Malik Najaf Khan
Designation: Manager Projects Appraisal and Management
Tel: +92-51-9108300 Fax: +92-51-9108377 Email: [email protected]
Address: NDRMF, 5th Floor, EOBI House, Mauve Area, Sector G-10/4, Islamabad