Building Resilience of Damaged Flood Mitigation Structures along River Indus in Sindh Province Phase-II

BUILDING RESILIENCE OF DAMAGED FLOOD MITIGATION STRUCTURES ALONG RIVR INDUS IN SINDH PROVINCE PHASE-II

Project Code:  NDRMF-07-23

Fund Implementing Partner: irrigation Department. Government of Baluchistan

Project Profile

Grant Implementation Signing Date

17th July 2023

Project Start Date

17th July 2023

Project End Date

31st January 2024

Completion Time (Duration)

6 months 14 days

  • Thematic Area: Flood Resilience
  • Plan: NDMP, SFDRR, NFPP-IV
  • Entity: Public

Loading..........

The Data is Not Available

Indicators

Achievement

Number of flood protection/water conservation structures and river training works constructed/improved (levees, dikes, GLOF schemes etc.)

Rehabilitation of Stone Apron Mile 1/1+360 to 1/2 and Stone Pitching Mile 0/0 to 2/4 Along Baiji
District Sukkur
Stone Apron Mile 1/1+360 to 1/2
Stone Pitching Mile 0/0 to 2/4
 
Restoration/ Raising & Strengthening Along R.N Loop Bund Mile 0/0 to 3/0 & Garkino Loop Bund Mile 0/0 to 2/6, Providing Stone Pitching Along R.N Bund Mile 5/0 to 6/0 and Providing Stone Apron Along Baiji Bund Mile 7/5 to 7/6Ghotki
District Sukkur
Raising and Strengthening of Bunds
Stone Apron
Stone Pitching

KM of critical flood disaster risk reduction structures retrofitted and/or reconstructed

6.126 km

  • Funding Ratio :

100% NDRMF Share

    Project Size: Medium (100-500)

0 M
Total Project Cost
  • Status :
Completed
Project Objective

Project objective is to contribute towards disaster-resilient Sindh with reduced socioeconomic and fiscal vulnerability to natural hazards and climate variability and change.

Project Outcome

Human lives are saved and infrastructure protected from flood damages (including thickly populated area of the district Sukkur fertile agriculture land, Indus highway, Pano Akil Town, cotton & sugar mills railway track and many other public and private infrastructures.

Project Impact

A more disaster-resilient Sindh with reduced socioeconomic and fiscal vulnerability to natural hazards and climate vulnerability and change.

Geographical Coverage

Sindh (District Sukkur).

Geographical Coverage

Project Gallery

INTERVENTIONS

PROVINCE

DISTRICT

PROJECT SITE

Rehabilitation of Stone Apron Mile 1/1+360 to 1/2 and Stone Pitching Mile 0/0 to 2/4 Along Baiji Bund
District Sukkur
Stone Apron Mile 1/1+360 to 1/2
Stone Pitching Mile 0/0 to 2/4

Sindh

Sukkur

Baiji Bund

Restoration/ Raising & Strengthening Along R.N Loop Bund Mile 0/0 to 3/0 & Garkino Loop Bund Mile 0/0 to 2/6, Providing Stone Pitching Along R.N Bund Mile 5/0 to 6/0 and Providing Stone Apron Along Baiji Bund Mile 7/5 to 7/6Ghotki
District Sukkur
Raising and Strengthening of Bunds
Stone Apron
Stone Pitching

Sindh

Sukkur

R.N Loop Bund, Garkino Loop Bund

Targeted Beneficiary

Total Beneficiary
Direct Beneficiary
Indirect Beneficiary
Project Description

Floods 2022 inflicted heavy losses of lives, livelihoods and infrastructure across Pakistan and Sindh was one of the worst affected province. A total of 10 million people affected in 30 districts. The worst affected areas remained inundated for months due to absence of natural drainage pathways leaving behind a vast magnitude of damaged public infrastructure, agriculture land and houses of people. The irrigation department government of Sindh submitted proposals or reconstruction and rehabilitation of infrastructure schemes that received major damages/losses during the monsoon floods 2022 in district Sukkur. Post completion of the project, the live, livelihood, private and public infrastructures will be saved and enhance resilience against floods in the area. The list of schemes implemented under the project is as follows:

Sr. No.

Sub-Scheme Name

01

Rehabilitation of Stone Apron Mile 1/1+360 to 1/2 and Stone Pitching Mile 0/0 to 2/4 Along Baiji

02

Restoration/ Raising & Strengthening Along R.N Loop Bund Mile 0/0 to 3/0 & Garkino Loop Bund Mile 0/0 to 2/6, Providing Stone Pitching Along R.N Bund Mile 5/0 to 6/0 and Providing Stone Apron Along Baiji Bund Mile 7/5 to 7/6 Ghotki