Landslide Control, Management and Mitigation along Major Roads in AJK Poonch Division (District Pooch & Bagh)
Project Code: GB-008
Fund Implementing Partner: Communication & Works Department Government of AJK
Project Profile
Grant Implementation Signing Date
23rd December 2019
Project Start Date
23rd December 2019
Project End Date
15 June 2023
Completion Time (Duration)
42 Months
- Thematic Area: Disaster Risk Resilience
- Plan: NDMP, SFDRR, SGD
- Entity: Public
Loading..........
The Data is Not Available
Indicators
Achievement
- 5 Nos. Structure for land stabilization
- Funding Ratio :
70% NDRMF Share
30.% FIP Share
Project Size: Large (<500)
- Status :
Completed
The overall project objective was to enhance resilience against landslides and reduce vulnerabilities.
The landslides stabilized resulted in safety of human lives, valuable property and improved access to employment opportunities.
The project had a positive Social, economic & environmental impact on the targeted area.
This will be achieved through the following:
- Reduced road accidents by falling rocks in landslides areas, improve time and safety of travel.
- Decreased impact of landslides, vulnerabilities and protect agricultural and non-agricultural land.
- Sustainable road connectivity, communication between adjoining areas, reliable access and transport for food, transport, livelihoods and income generation purposes.
- Secured private, government properties including land, machinery and forests from hazards.
- Provided smooth traffic flow for heavy vehicles that transport goods, which ultimately will reduce the risk of accidents.
Geographical Coverage
Project Gallery
Interventions | Province | District | Project Site |
---|---|---|---|
1. Dhalkot, Arja-Tian Road Poonch Landslide Control & Management | AJ&K | Poonch | Tian-Dalkot |
2. Azad Pattan, slide A, Azad Pattan-Rawalakot Road Poonch Landslide Control & Management | AJ&K | Poonch | Azad Pattan |
3. Azad Pattan Slide B , Azad Pattan-Rawalakot Road Poonch Landslide Control & Management | AJ&K | Poonch | Azad Pattan |
4. Guin River, Azad Pattan-Rawalakot Road Poonch Landslide Control & Management | AJ&K | Poonch | Near Afsar Market |
5. Mang Bajri Arja Bagh Road Landslide Bagh | AJ&K | Poonch | Mang-Bajri |
Targeted Beneficiary
The project aimed at enhancing resilience by reducing vulnerability against landslides. This project provided an uninterrupted flow to traffic between the adjoining and forward areas which enabled the populations to access services (health and education), livelihood opportunities, enhance tourism for economic empowerment, and other income generation activities. The project interventions focused on landslide management & control through construction of 5 landslide mitigation structures namely.
- Dhalkot, Arja-Tian Road Poonch Landslide Control & Management
- Azad Pattan, slide A, Azad Pattan-Rawalakot Road Poonch Landslide Control & Management
- Azad Pattan Slide B , Azad Pattan-Rawalakot Road Poonch Landslide Control & Management
- Guin River, Azad Pattan-Rawalakot Road Poonch Landslide Control & Management
- Mang Bagri Arja Bagh Road Landslide Bagh
Name: Amina Sadaf
Designation: Deputy Manager Projects Appraisal and Management
Tel: +92-51-9108300 Fax: +92-51-9108377 Email: amina.sadaf@ndrmf.pk
Address: NDRMF, 5th Floor, EOBI House, Mauve Area, Sector G-10/4, Islamabad